1.1      BCDS - Bunch Compressor Design

Task Manager: M. Pedrozzi (PSI)

 

1.1.1        Milestones

 

 

 

 

1.1.2        Following activities

 

 

1.1.3        Task integration

The task activities should be integrated and considered as an extension of the present effort made for the ILC bunch compressor design, mainly coordinated by SLAC (http://www-project.slac.stanford.edu/ilc/acceldev/LET/BC/). The multi-TeV beam parameters specifications upstream and downstream of the chicanes are presently driven by the CLIC requirements. The transport studies from the damping ring to the IP (task LAST) should give a realistic phase space for the ultimate chicane optimisation. The chicane simulation results and in particular the sensitivity to dynamic and static imperfections requires as well a close interaction with the LAST activities.

1.1.4        Deliverables

The deliverables in Jan 2008 are the following.

1.    A conceptual design of a compression chicane suitable for multi-TeV linear colliders with an evaluation of the CSR effects and the compressor performances.

2.    A conceptual design of a path length tuning chicane including the CSR effects and the turn around loop lattice.